Backed up by a 250KW 208/120 3 phase Diesel Generator, the Generator and the Fuel tank are fused together as one stand alone unit.
The Fire Alarm System consisted of one main panel and two Booster panels. Partnering with Protection Technologies Inc. helped to provide a seamless startup. Thanks Guys!
The Madison Water Utility Operations Building is the place where the Water Utility maintains its work and service vehicles, as well as welding and painting of various water mains.
Mead & Hunt provided the Engineering support granting us a nice lighting scene at the front entrance having structural elements partnering with cloud lighting.
Electrically the service consisted of a 1200 Amp main disconnect with 1000 Amp fuses
Copyright © KVA Electric. All rights reserved.
Free Support
+1.6084759768